EeBGuide
Home
Information
Videos
Newsletter
Policy notes
Contact
Guidance document
EeBGuide Guidance Document Part A: PRODUCTS
EeBGuide Guidance Document Part B: BUILDINGS
Downloads
Training materials
Case studies
Glossary
Links
6.2 Modules A1–A3 – Raw materials supply, transport, manufacturing.
Oct 22, 2012
—
by
Zsoka Gyetvai
in
Existing buildings
,
New buildings
6.2 Modules A1–A3 – Raw materials supply, transport, manufacturing.
A-01 Use and adaptation of available cradle-to-gate and cradle-to-grave LCA or EPD data for building products and technical equipment
A-02 Accounting for technical building equipment – screening and simplified LCA.
A-03 Accounting for technical building equipment – complete LCA.
Lifecycle stage: A (all modules)
Lifecycle stage: A1-A3
←
Previous:
A-01 Distinction between wastes and by-products during the extraction and the processing stages
Next:
6.2 Module A1 – A3 – Raw material supply, Transport, Manufacturing.
→